Concrete column calculator

This calculator handles a set of columns or piers that share one cross-section and one height. Pick rectangular or round, enter that section, the height, and the count. It returns the volume and a bag count.

Calculator

Results update as you type. The switch is remembered in this browser.

The other side of the cross-section, not how tall the column is.

Extra concrete for the whole set. Use 0 for no extra.

Yields are typical dry-mix figures. Check the bag you are buying.

Result

Enter the measurements to see the order quantity.

How this calculator works

A column is a cross-section times a height, then times how many of them you are pouring. Rectangular volume in cubic feet is the width in inches over 12, times the depth in inches over 12, times the height in feet, times the count. Round volume uses the same height and count, with pi times the radius in feet squared in place of the rectangle. Metric does the same job in metres: millimetres become metres by dividing by 1,000.

The shape control decides which fields count. Rectangular asks for two sides. Round asks for a diameter. The unused fields are hidden and are not required, so a blank width does not block a round pier.

Waste multiplies the whole set once. Five percent on four piers is not five percent four times. Zero waste orders the measured concrete only. The result lists the exact volume and the volume to order separately.

Bags round up from that order volume. The yields match the slab and footing pages: 0.60 cubic feet for 80 lb, 0.45 for 60 lb, 0.30 for 40 lb, and 0.012 cubic metres for 25 kg. Partial bags become a whole extra bag.

Worked examples

Four round piers

Shape round, diameter 12 inches, height 8 feet, count 4, waste 0, 80 lb bags. Exact volume 0.93 cubic yards. Bags to buy 42. One pier is the circle times 8 feet. Four of them are the volume you see. If these piers sit in the ground and you only need concrete above the footing, the height is the concrete height, not the length of the tube you bought.

One square column

Shape rectangular, width 16 inches, depth 16 inches, height 8 feet, count 1, waste 0, 80 lb bags. Exact volume 0.53 cubic yards. Bags to buy 24. The section is 16/12 feet on each side. People sometimes type 16 as the height because the form is standing in front of them. Height is the tall dimension, in feet on this example, and 16 feet would be a different column.

Six metric tubes with waste

Shape round, diameter 300 millimetres, height 2.4 metres, count 6, waste 10 percent, 25 kg bags. Exact volume 1.02 cubic metres. Volume to order 1.12 cubic metres. Bags to buy 94. The 0.10 cubic metre gap is the waste. The bag yield on the result is 0.012 cubic metres. Six identical tubes are what the count is for. A seventh tube of a different diameter is another run.

Mistakes that throw the order off

Entering the radius as the diameter doubles the width and more than doubles the concrete, because the area grows with the square of the radius. The field says diameter. A 12 inch tube is 12, not 6.

Counting the footing pad inside the pier height makes the pier too tall or too fat. If the pad is 24 inches square and 8 inches thick, that pad is not a 24 inch pier. Calculate the pad as its own box and add it to the pier volume.

Mixing heights in one count hides a short pier inside an average. The form has one height. Split the set.

Leaving waste at 5 when the tubes are cut clean and the pour is small can be more concrete than you wanted. Set it to 0 if you mean zero. Leaving it at 5 when the holes are ragged can be too little. The field is visible so the allowance is a choice, not a surprise in the bag total.

Forgetting that every bag yield is typical, then buying a bag with a different coverage, is how a 42 bag estimate becomes the wrong number of bags on the receipt. Read the yield line, then read the bag.

A sonotube’s nominal size is the diameter this form wants, but the tube you bought might be described by an inside diameter that is not the number in your head. Measure the tube or read the label before you trust a memory of “about a foot.”

When a column is the wrong form

A wall footing is a trench, not a pier. Use the concrete footing calculator for a run measured in feet or metres with a width and depth in inches or millimetres. A patio is a slab. The concrete slab calculator takes length and width in the same plan units plus a thickness.

This page will not tell you the pier diameter, the depth below grade, or the steel. It multiplies the shape you enter. If a drawing already gives the section and the height, type those. The examples are checks on the arithmetic, not recommended pier sizes.

Common questions

How do I enter a round pier?

Choose Round. Enter the diameter in inches or millimetres, the height in feet or metres, and how many piers match that size. A 12 inch tube that is 8 feet tall is diameter 12 and height 8. The width and depth fields are for a rectangular column, and they hide when Round is selected so you are not asked for a side that a tube does not have.

How do I enter a square column?

Choose Rectangular. Enter both sides of the cross-section, then the height. A 16 inch by 16 inch column that is 8 feet tall uses width 16, depth 16, and height 8. Depth here is the other side of the section, not a second name for the height. The height field is the one in feet or metres.

What if the piers are not all the same?

Run each size on its own and add the bags. The count multiplies one cross-section by one height. It does not average a short pier and a tall pier. If four tubes are 8 feet and two are 4 feet, those are two calculations.

How many bags do four 12 inch piers take?

Four round piers, 12 inches in diameter and 8 feet tall, with no waste and an 80 lb bag at 0.60 cubic feet, come to 0.93 cubic yards and 42 bags. The formula uses the area of a circle, pi times the radius squared, times the height, times four. Leave the waste at 5 percent and the order is larger than 42. The example clears waste so you can see the piers alone.

Does this include the footing under the pier?

No. A pier on a wider pad is two shapes. The pad is a short footing or a small slab. The pier is this page. Add the volumes. Entering the pad width as the pier diameter orders a fat column and forgets that the pad is thinner than the pier is tall.

Can I pour these from a truck instead of bags?

Yes. Read the volume to order to the plant and ignore the bag count, or use the bag count only as a check on a small job. The page does not know the plant's minimum load. A handful of piers is often still a bag job. A row of large columns may not be.

Why does a round pier use pi?

The cross-section is a circle. The area is pi times the radius squared, and the radius is half the diameter you typed. A 12 inch pier has a 6 inch radius. The formula line shows that radius and the cubic feet for one pier before it multiplies by the count. You do not have to remember pi. You do have to enter the diameter, not the radius.

Is the bag yield exact?

It is a planning default. An 80 lb bag is taken as 0.60 cubic feet, and a 25 kg bag as 0.012 cubic metres. Brands differ. If the bag in the store prints another yield, the bag count on this page is only a starting point. The result names the yield so you can compare them.

  • Concrete footing

    Continuous footing from length, width, and depth, plus a bag count.

  • Concrete slab

    Rectangular slab or patio from length, width, and thickness, then bags at the yield you pick.

Updated 29 November 2026. Written by August H. The byline is not a claim of a license or a trade.