Concrete slab
Rectangular slab or patio from length, width, and thickness, then bags at the yield you pick.
Three concrete shapes, one bag yield. A patio, a trench, and a pier are not the same box, so they are not the same page.
Rectangular slab or patio from length, width, and thickness, then bags at the yield you pick.
Continuous footing from length, width, and depth, plus a bag count.
Round or rectangular piers from the cross-section, height, and how many you are pouring.
Use the slab calculator when both plan dimensions are in feet or metres and the third number is a thickness in inches or millimetres. A patio, a shed pad, and a small walk are that shape. The thickness is the concrete only. Gravel under the slab is a separate order on the landscaping hub.
Use the footing calculator when the long dimension is the run of a wall and the width and depth are the cross-section, in inches or millimetres. An L-shaped house is two runs. A step in the trench is two depths. Add the results. This site will not tell you how wide or how deep the footing has to be. That depends on soil, frost, and the building, and those rules are local.
Use the column calculator for piers and posts that share one cross-section and one height. Rectangular asks for two sides. Round asks for a diameter, not a radius. The count multiplies one size. Different heights are different runs. A pad under a pier is not part of the pier. Add that volume from the footing or slab page.
All three pages use the same planning yields: 0.60 cubic feet for an 80 lb bag, 0.45 for 60 lb, 0.30 for 40 lb, and 0.012 cubic metres for a 25 kg bag. The count rounds up. The result names the yield. If the bag in your hand prints a different number, the bag wins.
A short pier footing can be a bag job. A house trench or a large patio is often ready-mix. Read the volume to order to the plant and ask about their minimum load. The page does not know that minimum. Waste starts at 5 percent on these forms and is shown as its own line. Set it to zero when you mean zero.
The patio guide walks through a slab measurement and the worked bag counts. The footing guide walks through a trench measured in feet and inches, or metres and millimetres, and the mistakes that turn a 16 inch footing into a 16 foot one. Neither guide is a structural specification.
Measure a rectangular patio, add a visible waste allowance, and turn the thickness into cubic yards or bags before you order.
Measure a continuous footing as a run plus a cross-section, then see the volume and the bags without treating the example as a required size.