How much concrete do I need for a patio
A patio order starts as a rectangle and a thickness. This guide shows what to measure, how waste changes the number, and when the bag count stops being the useful line. It does not pick a thickness for your yard.
What you are actually ordering
A poured patio, for this site, is a box. Length times width times thickness is the concrete. The gravel, the sand, or the compacted base under that box is a different material and a different depth. People get the order wrong by measuring from the top of the grass to the bottom of the hole and calling all of it concrete. If the hole is 8 inches deep and you want 4 inches of concrete, the stone is the other 4 inches. The concrete slab calculator takes the concrete thickness. The gravel calculator takes the base.
Measure the finished patio in feet, or in metres, along both plan directions. Measure the concrete thickness in inches, or in millimetres. Do not mix those. A 10 foot by 10 foot pad at 4 inches is not a 10 by 10 by 4 foot box. The form labels the units beside the fields so the thickness stays in inches while the plan stays in feet.
Walk the outline before you trust a single length. A patio that is 12 feet at the house and 10 feet at the garden edge is two widths, or you average them only after you have actually averaged them. A curve is not a width. Break a curve into rectangles that follow the edge, or compute the real area and turn it into a rectangle of the same area. Entering the longest length and the widest width buys concrete for the corners of a rectangle you are not pouring.
The volume, then the bags
In feet and inches, the cubic feet are length times width times thickness, with the thickness divided by 12. Divide cubic feet by 27 to get cubic yards. A 9 foot by 9 foot pad at 4 inches is 27 cubic feet, which is 1.00 cubic yard. At the planning yield of 0.60 cubic feet per 80 lb bag, that is 45 bags. The yield is typical for dry mix, not a reading of every brand. The result names it so you can hold it next to the bag.
A 10 foot by 10 foot pad at 4 inches with no waste is 1.23 cubic yards. The same pad at 10 percent waste is 1.36 cubic yards and 62 bags of 80 lb mix. The gap between 1.23 and 1.36 is the allowance, not a thicker slab. The calculator shows both volumes. If you only remember one number, remember which one you are reading to the plant.
Other bag sizes on that same 10 by 10 by 4 inch pad, with no waste, are 56 bags at 80 lb, 75 at 60 lb, 112 at 40 lb, and 79 at 25 kg. Those counts use 0.60, 0.45, and 0.30 cubic feet, and 0.012 cubic metres. They round up. A partial bag is still a bag on the pallet. Confirm the yield printed on the brand you are buying before you treat any of those counts as an order.
In metres, a 4 by 3 metre pad at 100 millimetres with 5 percent waste is 1.20 cubic metres exactly and 1.26 cubic metres to order. At 0.012 cubic metres per 25 kg bag that is 105 bags. Switching units does not design a new patio. It converts the dimensions you already typed.
Waste, edges, and a truck
The waste field starts at 5 percent on the slab form. Five percent is an ordering allowance for a form that is a little wide, a grade that is not dead flat, and the last bit that sticks in the wheelbarrow. It is not a code requirement and it is not a thickness. Set it to zero when the forms are tight and you mean the bare box. Raise it when the ground is rough. Do not hide a thicker edge inside the percentage and then forget you did that. A thickened edge is extra volume. Measure it as its own small footing, or accept that the rectangle does not include it.
A 20 foot by 10 foot patio at 6 inches with 10 percent waste is about 3.70 cubic yards exactly and 4.07 to order, which is 184 bags of 80 lb mix. That is a lot of bags to carry, mix, and place before the concrete starts to set. At that size, the volume to order is the number to read to a ready-mix plant. The bag count is a check, not a shopping list. Ask the plant what their minimum load is. This site does not know it. A delivery fee can be larger than the difference between 5 percent and 10 percent waste, which is another reason to separate the concrete price from the truck.
What this does not decide
Nothing here tells you that a patio must be 4 inches, or 100 millimetres, or any other thickness. A slab that only sees foot traffic is a different problem from a slab that will hold a hot tub, a vehicle, or a roof post. Reinforcement, control joints, the base, and the slope of the surface are not in the volume. Drainage is a site question. Do not treat a rule of thumb you heard about slope as a fact this guide has verified.
If the concrete is a trench under a wall, it is a footing, not a patio. The footing guide measures a run in feet or metres and a cross-section in inches or millimetres. If the concrete is a pier, it is a column. Mixing those shapes on the slab form will not describe them.
Before you call, write down three things: the rectangle you measured, the thickness of concrete only, and the waste percent you chose. Then read the volume to order or the bag count, and the yield line, and compare the yield with the bag. The arithmetic is the calculator. The decision to pour is still yours.
Calculators for this job
- Concrete slab
Rectangular slab or patio from length, width, and thickness, then bags at the yield you pick.
- Gravel and crushed stone
Volume from length, width, and depth, tons from a density you can edit, and an optional cost per ton.
Updated 29 November 2026. Written by August H. The byline is not a claim of a license or a trade.