Landscaping

How much gravel to order

Gravel is ordered as a volume and often paid for as a weight. This guide shows the box, the default density, and why the cost line uses the full weight rather than the rounded tons. It does not pick a quarry product for you.

Volume first

The hole, or the bed, is length times width times depth. Depth in inches becomes feet when you divide by 12, and cubic feet become cubic yards when you divide by 27. Depth in millimetres is divided by 1,000. One cubic yard does not cover a fixed area until you choose a depth. At 2 inches, a cubic yard covers about 162 square feet. At 3 inches, about 108. At 4 inches, about 81. A path 10 feet wide and 40 feet long is 400 square feet. At 3 inches that is 400 divided by 108, about 3.70 cubic yards, which is the exact volume in the first example on the gravel calculator.

The waste field starts at 10 percent. On that 10 by 40 foot path the order becomes 4.07 cubic yards. The 0.37 cubic yard gap is the allowance for uneven ground and scatter. It is not a compaction factor. Compaction depends on the product, the moisture, and how hard you roll it. If you need 4 inches after compaction, the loose depth has to be deeper than 4 inches, and this site will not invent that extra. Measure the loose depth you intend to place, or raise the waste until it matches what the supplier recommends for that product, and write down which one you changed.

Curves and flares are more than one rectangle. A drive that is 10 feet wide for most of its length and 18 feet at the street is two areas. One average width is fine only when you averaged it. A circle entered as diameter by diameter is the square around the circle, which is too much stone.

Tons are not yards

Weight is the order volume times a density. Leave the density blank and the calculator uses 1.4 short tons per cubic yard. On the 10 by 40 foot path with 10 percent waste, that is 5.70 short tons. In metric the same default is about 1.66 tonnes per cubic metre. An 8 metre by 1.2 metre path at 50 millimetres with 10 percent waste is 0.48 cubic metres exactly, 0.53 to order, and 0.88 tonnes. The formula shows the density it multiplied, including the extra digits behind the 1.66 you see in the summary.

Those two densities are the same physical rate, converted. They are a planning figure for crushed stone, not a promise about pea gravel, recycled concrete, or the pile at a particular yard. If the quarry publishes a density, type it. Changing the density on a 12 by 24 foot area at 4 inches, with no waste, from the default to 1.5 short tons per cubic yard moves the weight from 4.98 short tons to 5.33. The volume stays 3.56 cubic yards. Density does not create stone. It only changes how heavy the stone you measured is.

A number like 1,400 in the density field is rejected in imperial mode, because the field is short tons per cubic yard and 1,400 is not a stone density in that unit. It is usually kilograms per cubic metre typed in the wrong place.

The price is the full weight

Cost is optional. It is the weight times the rate you type, in your currency. Imperial cost is per short ton. Metric cost is per tonne. Switching units converts the rate so the material total does not jump. Delivery, tax, fuel, and geotextile are not in the line.

On a 12 by 24 foot area at 4 inches, with no waste and a rate of 45, the weight shows as 4.98 short tons and the material cost is 224.00. The unrounded weight times 45 is a round 224. Multiplying the displayed 4.98 by 45 gives 224.10, a dime higher. The formula uses the full weight and rounds the tons for reading. There is still no delivery in the 224.00. If the truck costs extra to show up, the stone is not a 224 job.

Hauling and the slab next door

At 1.4 short tons per cubic yard the stone is 2,800 pounds per yard. Check the payload sticker on a pickup before you offer to haul it. A short path can be a legal load. A 5.70 short ton path is not one trip in a light truck. The calculator gives the weight. The door jamb of the truck tells you whether the truck can take it. A yard may also have a minimum load larger than your order. Ask them. There is no universal minimum in the result.

If this stone is the base under a patio, keep it separate from the concrete. The patio guide takes the slab thickness. This page takes the loose depth of stone. Using one depth for both is how people buy twice as much of one and none of the other. Fabric and edging are sold by the roll and by the length. Budget them beside the tons instead of burying them in the waste percentage.

Replace the default density as soon as you have the quarry’s number. The result says “planning default” when it is using 1.4. When those words disappear, the density is yours. The mulch guide is the volume-only cousin of this page, for bark and soil that should not be forced through a per-ton price.

Calculators for this job

  • Gravel and crushed stone

    Volume from length, width, and depth, tons from a density you can edit, and an optional cost per ton.