How deep to lay mulch and topsoil
Mulch and topsoil are a rectangle and a loose depth, then a bag size. This guide explains the presets, the 10 percent allowance, and why the page will not guess a weight. It does not tell you the right depth for every plant.
Depth is a choice you type
Two, three, and four inches, and 50, 75, and 100 millimetres, are buttons on the mulch calculator because those are depths people measure, not because one of them is correct for every bed. A tree ring, a vegetable bed, and a path can want different amounts. A nursery may have told you a depth for a product. Type that, or press the button that matches it, and the volume follows. You can still type any other depth. The button only fills the field.
The depth is the loose material you intend to place. It is not a depth after the pile settles, and it is not a depth after you walk on it. If last year’s mulch is still there, measure the new material only. Ordering a full bed on top of a bed you already have is how a thin top-up becomes a truck.
The math is the same box as a slab. Length times width times depth. Depth in inches is divided by 12. Cubic feet are divided by 27 to become cubic yards. Depth in millimetres is divided by 1,000. A 20 by 10 foot bed at 3 inches with no waste is 50 cubic feet, which is 1.85 cubic yards and 25 bags if the bag is 2 cubic feet. Fifty divided by 2 is 25, so that one lands on a whole number of bags. Put the waste back to 10 percent and both the yards and the bags rise.
A 12 by 12 foot bed at 2 inches with no waste is 24 cubic feet, 0.89 cubic yards, and 12 bags of 2 cubic feet. Two inches looks like “a few bags” until you do the rectangle. It is still 12 bags.
Bags, bulk, and no pretend weight
Bag sizes on the form are 1, 2, or 3 cubic feet, and 50 litres. Fifty litres is 0.05 cubic metres. An 8 by 4 metre bed at 50 millimetres with 10 percent waste is 1.60 cubic metres exactly and 1.76 to order, which is 36 bags of 50 litres. The count rounds up because you cannot buy a fraction of a sealed bag. If your shop sells 1.5 cubic foot bags, or any other odd size, the count is wrong until you account for that size. The result names the size it divided by. Read the bag, then read that line.
A bulk yard sells the same job by the cubic yard or cubic metre. Read the volume to order and ignore the bags. Ask whether the truck has a minimum larger than your number. Edging and fabric are not in the cubic yards.
This page does not estimate weight. Mulch can be light. Wet topsoil can be heavy. A single default density would pretend they are the same product. If you need tons, you are probably ordering stone, and the gravel guide is the one that takes a density. Do not force bark through a per-ton price you invented. Ask the supplier what a cubic yard of that product weighs before you load a pickup. The volume is not a hauling limit. The truck’s payload sticker is.
Waste, curves, and the patio next to the bed
Waste starts at 10 percent. It is an allowance for a bed that is not a perfect box, for tucking mulch around plants, and for a thin spot at the edges. It is not a prediction of how much the mulch will settle. Settlement depends on the product and the weather. If you want 3 inches after it settles, raise the depth or the waste yourself and remember which one you changed.
A curved bed ordered as one wide rectangle buys mulch for corners that are not in the bed. Split the curve into rectangles, or use the real area. A tree ring that is a circle is the circle’s area, not the square around it. You can turn that area into a rectangle of the same area and enter that.
Ignoring waste on a bed full of shrubs usually means you stop short of the back edge. Ten percent is the default because tucking around plants uses more than the flat rectangle. If the bed is empty and flat, lower it. If you are filling against a wall and the soil is heaped, raise it.
Mulch is not the base under a patio. The concrete thickness and the gravel base are the other two orders. A bed of mulch beside a patio is this page, at the depth of the mulch, on the area of the bed. Mixing the depths is how one material gets ordered twice.
The buttons save you from typing 3 or 50. They do not choose a gardening depth. Once the number is in the field, the rest is the box and the bag size, and both are on the result in words you can read back to the supplier.
Calculators for this job
- Mulch and topsoil
Cubic yards or cubic metres, bag count, and presets for common depths.
- Gravel and crushed stone
Volume from length, width, and depth, tons from a density you can edit, and an optional cost per ton.
Updated 29 November 2026. Written by August H. The byline is not a claim of a license or a trade.